Services and housing
Moving: compare inventory, access and services
Two removal estimates are comparable only if they cover the same objects, the same access and the same division of tasks.
Quick response
Essential in a minute
Provide an inventory and the constraints of both addresses to each company. Ask for a detailed estimate, the tasks included and the identity of the stakeholders. Compare access, handling, calendar, exclusions and supplements. The DGCCRF highlights the risks associated with certain on-line quotations and insufficiently explained subcontracting: keep the written responses.
1. Preparing a workable inventory
List the furniture, cartons, and items that require special attention. Note the useful dimensions, removable parts, and photos necessary for the evaluation. Report the outbuildings, cellars, and other places to empty. Present the same list to each company and update it if your need changes. A quick estimate should not hide a large object or extra task. Ask how the provider evaluates the volume and validates the inventory: the objective is to compare quotes for the same work, not to get only the lowest figure.
- All areas included.
- Special objects reported.
- Identical inventory for estimates.
2. Describe constraints at both addresses
Lift up floor, lift, crossing dimensions, distance between parking and entrance, and time constraints. Check what needs to be organised with the building or local authorities and ask who is responsible for it. Report information that is still unknown rather than implicitly leaving it favourable. If a remote visit or evaluation is proposed, prepare the necessary views. Ask how a change of access would be processed and encrypted. A service provided with a vehicle close to the door should not be compared without precision to an address requiring long handling.
- Departure and arrival described.
- Passes and parking checked.
- Explicit unknown information.
3. Distribute tasks and responsibilities
For each quote, indicate who supplies the cartons, packs, protects, disassembles, loads, lifts and removes the packaging. Identify the company with which you sign and ask if other stakeholders will perform the work. The control published by the DGCCRF highlights problems of subcontracting and information; do not deduct the identity of the team of a single logo on the page. Read exclusions, payment, documents and conditions of processing of a damage. Ask questions about specific items with their exact description, rather than accept a general answer on a supposed full cover.
- Tasks distributed in writing.
- Stakeholders identified.
- Exclusions and documents included.
4. Compare and control execution
Bring the quotes line by line with your inventory and both accesses. Note the amount, schedule, possible supplements and steps in case of change. Have any correction confirmed before selecting an offer. Then prepare the documents to be kept and check upon arrival, including items identified as individuals. DGCCRF mentions the estimate and the consignment note in its investigation; ask for the documents corresponding to your performance. In case of problem, record the facts and follow the steps planned without waiting to reconstitute the condition of the objects or the promises of the offer.
- Cost on a common basis.
- Confirmed corrections.
- Status and records retained.
Check that two quotes cover the same work
Fictional case: one quote includes dismantling and reassembling two pieces of furniture, while the other only covers transport. Ask for a separate line for each service and specify floors, lifts, carrying distances and access at both addresses. A lower total is not a comparable saving while these differences remain unresolved. Have the assumptions confirmed in the final quote.
- Identical scope and units.
- Assumptions and still-unknown charges identified.
- Terms of the specific offer confirmed.
Compare
Read a quote on a common basis
| Post | To be compared | Question |
|---|---|---|
| Inventory | Volume and objects described | Same load? |
| Access | Flooring and parking | Same handling? |
| Tasks | Packaging, disassembly and assembly | Who does every operation? |
| Speakers | Enterprise and subcontracting | Who does the performance? |
Fictional example · No merchant prices
Include access constraints in both quotations
Fictional example: A lists €400 then adds €120 for the described access and €80 for an additional service, totalling €600. B quotes the same inventory and services at €560. B costs €40 less for this scope. An imprecise survey or inventory can still make the quotes incomparable.
| Expense item | Offer A | Offer B |
|---|---|---|
| Product or basket | 400.00 € | 560.00 € |
| Extras | 200.00 € | 0.00 € |
| Total of included items | 600.00 € | 560.00 € |
The €200 covers only the two fictional services described.
- Describe floors, lift, carrying distance, parking and special items.
Before you continue
Final checklist : Compare removal quotes
Check the points you actually checked. Checks stay in this page during the visit; they are not sent to the server. A checked point does not constitute a validation of the merchant.
Guide: Compare removal quotes · Révision éditoriale : 28 October 2026.
Frequently Asked Questions
Useful answers
Is an online quote always enough?
Check if the inventory and accesses have actually been evaluated and validated. Ask how the missing items or changes are processed. An estimate without this information does not allow a reliable comparison of the work to be performed.
What should be specified for a piece of furniture that is difficult to pass?
Dimensions, known weight, possibility of disassembly and passages to both addresses. Add useful photos and ask for a method and encryption. Do not assume that a standard package includes a special operation.
How do I know who's coming on the scheduled day?
Ask the contracting firm for the identity and role of the stakeholders and the terms and conditions of subcontracting. Keep the answer and contact details for the procedures related to the performance of the service.
To check
Reference sources and documentation
The editorial update date does not guarantee a new verification of each source. See the references for an individual situation or regulatory evolution.
- DGCCRF — Relocation, online quotations and subcontractingSurvey of information, estimates and removal documents. No general recourse period without review of the situation.


